Procon closed the following projects during the Second Quarter:

  • Hopkins Lumber Kiln with Hopkins Lumber Contractors
  • St. Albans Tanks P&F with DN Tanks
  • 4H Archery SOG with Lionberger
  • Rocky Mount Elem. School Walkway direct for Rocky Mount Elementary
  • Mineral Gap Data Center with DPR Construction
  • Sheetz Wirtz Paving with Venture Construction
  • 3605 Latrobe with YTM Construction
  • Top Golf CLT with Arco Murray
  • The Bridges II with KBS Construction

 

Featured Project Updates:

VT Baseball Stadium Renovation and Addition/Blacksburg, VA

  • Building footings are complete
  • Structural steel is up
  • Stadium seating area set to begin
  • Project completion for Procon beginning of 2018

Pepsi Bottling Facility/St. Pauls, NC

  • Building concrete is substantially complete
  • Structural steel is up and building is under roof
  • Site concrete which includes loading dock, paving and other misc. concrete is in underway
  • Concrete portion of project should be complete by the end of Sept.

Project Unity/Winchester, VA

  • Foundations and SOG are substantially complete
  • Tilt panels are in progress and scheduled to be erected on Aug. 1
  • Project completion for Procon is the end of October, 2017